Winthrop, MA - 11/7/17 - Seawall repairs are well underway as progress continues in Winthrop, MA. The granite wall has been drilled in preparation for grouting. The drilling insures that the foam grout injections reach the back of the concrete wall sealing it to prevent water permeation. The concrete wall has been prepared for refacing using a grid pattern and rebar that will reinforce the wall.
Concrete wall with grid pattern
Concrete wall, grid pattern with rebar
Drilling of granite wall
Granite wall with drilled holes ready for grouting
Winthrop, MA - 10/19/17 - MDR crews are diligently working on the seawall repairs to both the granite and concrete seawalls at Winthrop Beach. The repairs include epoxy grouting of the granite wall and epoxy injection of the concrete wall using a Warren Environmental patented epoxy foam.
Needham, MA - 10/10/17 - Downtown improvements (Phase 1) has been completed on Great Plain Ave in Needham, MA. Town officials held a ribbon cutting ceremony today, October 10, 2017 at 2 PM, which was attended by MDR President Mike Saccone. The now finished project included road widening, drainage improvements, traffic signals and various streetscape amenities. The Town of Needham could not be more pleased with the work completed by MDR and its crews.
Taunton, MA - 10/4/17- The retaining wall is nearing completion at the intersection of County St and Hart St in Taunton, MA. Traffic signal work will soon begin with removal of a traffic arm. It will be replaced with a temporary signal pending completion of the new traffic system.
Needham, MA - 10/4/17 - Work has concluded in downtown Needham, MA where improvements have been underway since summer of 2016. The final steps were paving and striping. The offical ribbon cutting is set for October 10, 2017.
Weymouth, MA - 9/27/17 - MDR Construction was successful bidder today at 2 PM for a new project in Weymouth, MA! The project involves the betterment of King Oak Hill Park and the low bid that won MDR the contract was $1,721,591.00. The Town of Weymouth project will see the construction of a new 1500 foot pavilion as well as a building for public restrooms. Additional improvements will include new sidewalks and lighting, 55 parking spaces, a fully accessible 5 foot wide hilltop perimeter walk, updates to the storm water management system and greater preservation of existing vegetation. MDR is very excited for the project and can begin mobalization as early as October 18, 2017. The project is expected to be completed May 1, 2018.
Winthrop, MA - 9/26/17 - Utility work continues on Winthrop Shore Drive where new catch basins, water quality units and overflow protection are being installed.
Worcester, MA - 9/25/17 - Preconstruction has been completed at our site in Worcester, MA. The project will see the expansion of the PremaTech Advanced Ceramics facility. The scope of work for the preconstruction included: surveying, civil engineering, preliminary wetlands survey, code review, geotechnical Investigation, schedule and budget development, architectural and structural design and preparation of application(s) to City of Worcester, MA for required Building Permits. The next phase of the project will be building construction and is scheduled to begin in March 2018.
Taunton, MA - 9/25/17 - Work continues at the Harts Four Corners in Taunton, MA. The construction of the new retaining wall at CVS is currently underway. Full depth excavation has also begun in preparation for paving.
Winthrop, MA - 9/25/17 - Coastsweep Cleanup has been organizing an annual statewide beach cleanup in Massachusetts since 1978. Volunteers at the numerous event sites remove trash and debris as well as collect information on the types of debris found in order to determine their origins. The Winthrop Beach event, held adjacent to the MDR site on Winthrop Shore Drive, was sponsored by The Friends of Winthrop Beach and Massachusetts Coastal Zone Management and was held on Saturday, September 16, 2017. MDR Construction provided refreshments for the event and MDR President Mike Saccone participated in the event with his wife Connie Saccone.
By John Phelan - Own work, CC BY 3.0, https://commons.wikimedia.org/w/index.php?curid=9528299
Boxborough, MA - 9/25/17 - Final Paving was completed on September 19, 2017 at our 15 acre site in Boxborough, MA. The project consisted of construction of 244 multifamily housing units. The balance of striping and signage is currently in progress. JPI the Texas based company that commissioned the project is thrilled with the work completed by MDR and its crews. The project is expected to be 100% complete by October 3, 2017.
Winthrop, MA, 8/2/17 - MDR is fully underway with the Department of Conservation and Recreation (DCR) project on Winthrop Shore Drive in Winthrop, MA. We are currently installing an underground drainage recharge system, water quality units and roadway drainage. The next step will be complete rehabilitation of the existing potable water system including hydrants, house services and cross street connections. The DCR and the Town of Winthrop are working in conjunction with MDR Construction and are excited with the progress of the project.
Needham, MA, 7/28/2017 - Progress continues on Great Plain Ave in downtown Needham. The most recent installation consists of concrete pavers at two intersections, one of which has already been completed. After the concrete paver installation at the second intersection, the next step will be asphalt paving.
Taunton, MA, 7/24/17 - Work continues in Taunton as we begin the street widening portion of the project. County Street will be widened up to 10 ft at the intersection to provide two thru lanes in each direction, a left turn lane in each direction and four foot shoulders. Widening up to 20 feet into the graded, landscaped lawn of a recently constructed CVS building on the Southwest side of the intersection will provide thru lanes in each direction, an exclusive right turn lane in each direction, and four foot shoulders. Additional work includes roadway resurfacing, removing trees where necessary to accommodate the roadway widening, applying pavement markings, repaving driveway aprons, installing new catch basins, reconstructing sidewalks and wheelchair ramps, adjusting and relocating utilities as necessary, and upgrading traffic signal equipment.
Needham, MA, 4/5/17 - Phase 1 of the drainage relief project on Greendale Ave in Needham, MA has been completed. Phase 1 included storm water drainage and road reconstruction. MDR continues work on Phase 2 of the Town of Needham Department of Public Works contract. Phase 2 consists of furnishing and installing 1,550 feet of 24 inch RCP drain pipe along with the associated drainage structures, appurtenances, and coordination/relocation of existing utilities.
Taunton, MA, 5/22/17 - MDR begins work on intersection improvements at Route 140 and Hart Street. This project will provide safety improvements and reduce congestion for vehicles traveling along the “Harts Four Corners” in Taunton, MA. Upgrades to the traffic signal system will help to alleviate the traffic congestion. Construction includes new traffic signal equipment, roadway widening, new drainage infrastructure, new pavement, signage, and pavement markings.
Needham, MA, 5/22/17 - Work continues in downtown Needham where intersection improvements are underway on Great Plain Ave from Chestnut St to Dedham Ave. The completion of the project will see 575 linear feet of streetscape including pavement milling and overlay with areas of box widening and full depth road reconstruction. Other work includes traffic signal installation, traffic improvements, curbing, cement concrete sidewalks, concrete paver surface areas, wheelchair ramps, stamped concrete crosswalks, drainage improvements, new street lighting conduit and outlets within the common, plantings, and various streetscape amenities.
Needham, MA, 7/12/17 - Work continues in Needham as the new reservoir A submersible pump station is put in place. Work on this project also consists of installation of a precast concrete wetwall, precast valve vault, submersible sewage pumps and all appurtenances as well as installation of a precast concrete above grade utility building including all required controls, electrical equipment and provisions to connect the Town's trailer mounted standby generator. Additionally, work includes pigging the existing sewer force main to extend its service life.
Haverhill, MA, 6/24/17 - Lieutenant Governor Karyn Polito was in attendance at the ribbon cutting for the newly completed rail trail in Haverhill, MA. MDR completed the $2.2 million MassDOT contract which commissioned the construction of a 14 foot wide, 3,300 foot long multi-use path. Construction included earth excavation, floodplain compensatory storage area, full depth hot mix asphalt pavement installation, drainage improvements, cement concrete sidewalks, cement concrete wheelchair ramps, installation of modular block retaining wall, traffic signs, pavement markings, path lighting, emergency call boxes and landscaping.
Winthrop, MA, 6/26/17 - MDR breaks ground on new $12,712,719.09 Department of Conservation and Recreation (DCR) project on Shore Drive in Winthrop. The project includes full depth reconstruction, new sidewalks, curbing, storm drainage system, seawall repairs, landscaping and amenities. The seawall repairs will include; epoxy grouting of existing granite seawall and epoxy injection of existing concrete seawall.