Shrewsbury, MA, April 2017 - Work at the UPS location in Shrewsbury concluded in April of this year. MDR completed feeder staging expansion for 60 tractor trailer units tied into the existing 8ft culvert. Installation of a new drainage system including water quality units was also completed. In addition to curbing, paving and striping, MDR furnished and installed 62 tractor trailer stops for positioning.
Andover, MA, 4/21/16 - MDR employees including; David Brandano and President Mike Saccone volunteer time, truck, and expertise to help local Andover Boy Scouts build a pathway on trail.
Ayer, MA, 8/6/15 - MDR Construction Inc. breaks ground on facility expansion project with Catania Spagna. The completion of this project will see the extension of the existing rail road and construction of a commercial building. MDR helped Catania Spagna, a leading provider of organic cooking oils, obtain a $500,000 grant from the Commonwealth of Massachusetts for the rail road extension.
Tewksbury-based MDR Construction Inc. is moving to a newly built 6,800-sf facility on Shawsheen Street following the remediation of the former Brownfield site. MDR, a heavy civil contracting company specializing in site development, performed the construction itself. The firm has been based in Tewksbury since 1999, according to President Michael Saccone.
Read More